Hafotty | ![]() |
Incline and underground working
Showing the construction of the upper part of the incline and one of the openings to the underground workings.
The workings consist of a stope which is 10m (estimated) deep and perhaps 15m long. The stope has not been descended because of the loose material around the pitch head and concern about the state of the roof above the stope.
| Front page | Hafotty main page Index of mines | Area maps: Arenig, Harlech |


